2026 Top 50 Water Projects Report - Report - Page 16
TOP 50 WATER PROJECTS 2026
WASTEWATER
5
North End Sewage Treatment Upgrades
$3,000,000,000
2025 Rank: 5
Project Owner: City of Winnipeg
Location: Winnipeg, Man.
Engineer: KGS Group (owner’s advocate/
consultant)—NEWPCC Power Supply; AECOM
(consulting engineer)—NEWPCC Upgrade: Headworks, Biosolids & Nutrient Removal Facilities,
Design Builder—NEWPCC Power Supply: Black
& Macdonald, AECOM (design engineer), Design
Builder—NEWPCC Headwork Facilities: Red
River Solutions (Aecon/Oscar Renda JV); Hatch
(design engineer)—NEWPCC Biosolids Facilities
Upgrade: Red River Biosolids Partners General
Partnership (Aecon, Oscar Renda Contracting of
Canada Inc., MWH Constructors Canada Ltd.
Other Key Players: EY (management consultant); Veolia; P1 Consulting Ltd.; KGS Group Ltd.
(owner’s advocate/consultant); Wood (WSP)
(design engineer/geotechnical studies); Stantec
(engineer-design); Colliers Project Leaders;
Hanscomb (cost consultant); Hatch; Deloitte LLP;
Buy Social Canada; Victaulic (supplier)
Legal: Blake, Cassels & Graydon
Substantial Completion: 2030
16
WATER C AN ADA’S TOP 50 WATER PRO JEC T S
CREDIT
THE SCOPE OF WORK for the first capital project includes the design
and construction of a new headworks facility that will include a
raw sewage pump station, a micro-tunnel extension of existing
interceptor sewers, a grit removal system, a main control room, fine
screens and compactors, and a plant emergency generator facility.
The second capital project includes the design and construction of
a new biosolids facility that will address end-of-life equipment and
regulatory requirements regarding the recovery of nutrients and
maximizing biosolids reuse. It will add new facilities to treat the sludge
from the City’s three sewage treatment plants and replace end-oflife equipment. The third capital project includes the design and
construction of the nutrient removal facilities that will remove nitrogen
and phosphorus from the wastewater. •