WC133 NovDec 2023 - Magazine - Page 27
1
Before retrofit: The
Bovaird facility showing
signs of strain, with
evident sediment
accumulation and lagging drawdown times,
hinting at its outdated
design.
1
2
Transformation
underway: Retrofitting
in progress to enhance
the facility’s capacity,
address sediment
build-up, and integrate
modern stormwater
management measures
for better performance.
2
3
The basin marries a
two-stage treatment
with regulated water
flow and sediment
control. Lush, resilient
plantings aid in pollutant uptake, and its oversized capacity and clear
stone layer prioritize
the cooling and natural
flow of water.
Getty Images
3
WAT E R C A N A D A . N E T
WATER C AN ADA • NOV EMBER/ DECEMBER 2023
27