Capilano Water Supply
Infrastructure • $50 million
Location: Vancouver, B.C.
Owner: Metro Vancouver
Substantial Completion: 2025
METRO VANCOUVER is upgrading drinking
water infrastructure in the Metro Vancouver
Water Supply Area near Capilano River
Regional Park to ensure the continued
delivery of high-quality drinking water
to a growing region. Upgrades include a
backup power system and improvements
to the Capilano Water Supply Area security
gatehouse. Additionally, the North Shore
Rescue Society will be building a new
command post and storage building.
These projects are scheduled to begin
construction in fall 2022 and be completed
by late 2025. •
37
Mission Hill Water Treatment Plant
Filtration Upgrade • $40 million
KALAMALKA LAKE, the water source treated by the Mission
Hill WTP, has previously been susceptible to water quality
issues caused by turbidity events and seasonal algae, which are
expected to increase with climate change. The project consists
of a new water filtration system, a new building for labs and
control rooms, and upgrades to waste stream handling, related
piping and equipment, and control systems, which will lead to
enhanced operations, reduced water quality risks, and improved
redundancy in the system. AECOM will deliver detailed design and
recommended site upgrades for the addition of filtration at the
existing MHWTP to help improve water quality, increase access to
clean drinking water, and bolster the resiliency of the plant for the
Greater Vernon community year-round. •
BRADFORD WEST GWILLIMBURY
NAC
38
English River First Nation WWTP
$27 million
A NEW Indigenous-owned and operated wastewater treatment
facility and critical infrastructure on English River First Nation’s
(ERFN) Grasswoods Urban Reserve. The 135-acre reserve is
currently being developed by Des Nedhe Group, ERFN’s economic
development arm. •
39
Bradford Water Pollution Control
Plant Upgrades • $25 million
THE OBJECTIVE of the Bradford Water Pollution Control
Plant upgrades projects is to address the plant’s operational
requirements. This will ensure that there is adequate wastewater
treatment capacity to service growth to 2031. The project consists
of three phases. •
WAT E R C A N A D A . N E T
Location: Vernon, B.C.
Owner: Regional District of
North Okanagan (BC)
Engineering Consultant: AECOM
Location: Patuanak, Saskatchewan
Owner: English River First Nation
Des Nedhe Group
Substantial Completion: 2024
Location: Bradford, Ont.
Owner: Town of Bradford
West Gwillimbury
Design-Build: AECOMMaple Reinders
Substantial Completion: 2025