TOP 50 WATER PROJECTS 2026
WASTEWATER
7
Annacis Island Wastewater Treatment
Plant Expansion • $2,000,000,000
THERE ARE OVER 20 projects planned as part of the onsite improvements of the Annacis Island
Wastewater Treatment Plant. Key improvement projects include new trickling filters, secondary
clarifiers, and a co-generation facility to make better use of green energy captured on site.
Detailed design of the remaining Phase 2 Final Works is underway with construction anticipated
to commence in 2026. •
2025 Rank: 7
Project Owner: Metro Vancouver
Location: Delta, B.C.
Project/Construction Manager: Hatch (outfall project);
CDM Smith (Overall Construction Coordination)
Engineer: Brown and Caldwell, Klohn Crippen Berger,
CDM Smith, WSP (Stage 5 expansion); CDM Smith, WSP
(materials engineering and testing); Golder (WSP)
(outfall); Wood (WSP) (consulting engineer/geotechnical studies & materials tester); McMillen Jacobs, Arup
(design architect); EXP (geotechnical); Mott MacDonald
(consulting)
Contractor: Phase 1 Substantially Complete; Maple
Reinders Inc. (Phase 2 Gravity Thickeners and Aeration
Tanks Retro昀椀t); Bennett Mechanical Installations (Phase
2 Digester Heat Exchangers Upgrade); Pomerleau-Bessac
General Partnership (outfall pipeline); Graham
Other Key Players: AECOM (Stage 5 Phase 1 Design
review); WSP (materials engineering & testing); Wood
E&I (WSP) (consulting engineer/geotechnical studies &
materials tester); Hatch (tunnel design review and outfall
construction management); Colliers Project Leaders;
Jacobs; CDM Smith; Associated Engineering (project and
construction management/sta昀昀 augmentation); Envirowest (environmental); McElhanney; Victaulic (supplier);
Marsh Canada (risk advisor)
Legal: Norton Rose Fulbright (for Metro Vancouver)
Substantial Completion: 2032
DRINKING WATER
8
Coquitlam Water Main Project
$1,660,000,000
2025 Rank: 8
Project Owner: Metro Vancouver
Location: Coquitlam, B.C.
Project/Construction Manager: Stantec
Engineer: Jacobs-WSP; Hatch; EXP (geotechnical); Mott
MacDonald (consulting)
Contractor: Michels; Clearway Construction
Other Key Players: Marsh Canada (risk advisor)
Substantial Completion: 2030
20
WATER C AN ADA’S TOP 50 WATER PRO JEC T S
CREDIT
METRO VANCOUVER is constructing a new water main in the City of
Coquitlam to optimize the capacity of the existing Coquitlam water
supply system and to meet the growing demand for drinking water
in the region with the eventual expansion of the source supply under
the Coquitlam Lake Water Supply Project. The Coquitlam Water Main
is approximately 12 kilometres long, and ranges in diameter from 2.2
to 3.2 metres. The water main is being constructed in four sections.
Construction of the first pre-build section is underway. •