2026 Top 50 Water Projects Report - Report - Page 36
TOP 50 WATER PROJECTS 2026
NEW • WASTEWATER
33
Airdrie Wastewater Pipeline Expansion
$114, 000,000
Owner: City of Airdrie
Location: Airdrie, Alta.
Substantial Completion: 2028
THE PROJECT WILL see construction
of a new seven-kilometre wastewater
pipeline that connects to the City
of Calgary’s existing wastewater
treatment system. This regional
approach is a cost-effective and
environmentally responsible solution,
eliminating the need for a new
treatment facility while supporting
the development of thousands of new
homes and businesses. •
NEW • WASTEWATER
34
Kimberley Wastewater Treatment Plant
$90,600,000
KIMBERLEY’S NEW wastewater
treatment facility will be built near
the existing Pollution Control Centre.
The project is being delivered through
an Integrated Product Delivery
(IPD) agreement. The facility will
include: an administration building;
a headworks building; an Aerobic
granular sludge (AGS) process
block; UV Disinfection; and solids
management. •
Project Owner: City of Kimberley
Location: Kimberley, B.C.
Contractor: PCL Constructors Westcoast
Design: Urban Systems
Other Key Players: AquaNereda (AGS system
supplier)
Substantial Completion: 2028
NEW • DRINKING WATER
THE NAPANEE WPCP project includes
a new build and rehabilitation of parts
of the existing anaerobic digesters. This
wastewater treatment facility will have
a new headworks, activated granular
sludge (AGS) tanks, tertiary treatment
with Ultra-Violet (UV) disinfection, and
an operations building. This wastewater
treatment facility will be located beside
the existing WPCP on Water Street West.
Construction commenced in summer
2025, and the upgraded facility will be
operational in 2028. •
36
WATER C AN ADA’S TOP 50 WATER PRO JEC T S
Owner: Town of Greater Napanee
Location: Napanee, Ont.
Contractor: Peak Construction
Other Key Players: EVB Engineering
Funding:
Federal: $14 million
Provincial: $34.8 million
Municipal: $39.2 million
Substantial Completion: 2028
CREDIT
35
Napanee Water Pollution Control Plant
Upgrades • $88,000,000